Facilities Planning Projects

051005 - Campus Energy Metering and Conversation
051006 - Campus Carbon Monoxide Detection System
 I162VB - Retro-Commissioning Services Project Project Type: Various

05353 - RAC 3rd Fl HVAC & Sprinkler (SUCF)​
05267 - Renovate Houghton Hall (SUCF PROJECT)
D059GA - Andrews Comp. Window Replacement
05342 - McEwen Hall Exterior Rehab (SUCF PROJECT)
05338 - Rockefeller Arts Center Addition (SUCF)​
051003-02 - Demolish Academic Spine Bridge (SUCF)
05344 - Dods Hall Exterior Rehab
D059GK - Kirkland Complex Roof Replacement
05J01 - Replace AHUs & Controls Ph II & Ph III
05J00 - Fredonia Admissions Center

 

Project: 051005 - Campus Energy Metering and Conservation
Project Phase:  Out For Solicitation 
Design Cost:  To Be Determined
Consultant:  To Be Determined
Construction Cost: To Be Determined
Contractor:  To Be Determined

Expected Start of Construction:
Expected Completion of Construction:  08/31/2018

LATEST NEWS: Update current through 08/22/2016 -- RFQs for this project are due on 9/16/16.

Current RFQ Holders List

top


Project: 051006 - Campus Carbon Monoxide Detection System
Project Phase:  Out For Solicitation 
Design Cost:  To Be Determined
Consultant:  To Be Determined
Construction Cost: To Be Determined
Contractor:  To Be Determined

Expected Start of Construction:
Expected Completion of Construction:  01/31/2018

LATEST NEWS: Update current through 08/22/2016 -- RFQs for this project are due on 9/16/16.

Current RFQ Holders List

top


Project: I162VB - Retro-Commissioning Services Project (Facilities Services Project)
Project Phase:  In Review 
Design Cost:  
Consultant:  To Be Determined
Construction Cost:  Not Applicable 
Contractor:  Not Applicable
Expected Completion of Construction:  5/31/2017

LATEST NEWS: Update current through 08/12/16 -- 9 RFQs have been received and this project is currently in the review stage. 

Click here for Current "RFQ Holders List" 

top


Project: 05353 - RAC 3rd Fl HVAC & Sprinkler (SUCF Project)
Project Phase:  Construction
Consultant:  M/E Engineering
Contractor:  Northland Associates

LATEST NEWS: Update current through 08/12/2016 -- This project is in construction. Punchlist to be completed in early September. 

top


Project: 05267 - Renovate Houghton Hall (SUCF PROJECT) 
Project Phase:  On Hold
Consultant:  Mitchell Giurgola
Contractor:  To Be Determined

LATEST NEWS: Update current through 08/12/2016 -- This SUCF project is currently on hold for reprogramming.

top


Project: D059GA - Andrews Comp. Window Replacement
Project Phase:  Construction
Design Cost (for all 4 phases): $596,716.08
Consultant:  Flynn Battaglia Architects
Construction Cost: Phase III (Hemingway Hall) - $1,238,735 / Phase IV (Hendrix Hall) - $1,251,748
Contractor (for both current phases):  T.G.R. Enterprises, Inc.

LATEST NEWS: Update current through 08/12/2016 --

PHASE IV - HENDRIX HALL -- In Construction (expected completion in November 2016).

PHASE III - HEMINGWAY HALL -- In Construction (expected completion in August 2016).

top


Project: 05342 - McEwen Hall Exterior Rehab (SUCF PROJECT)
Project Phase:  Construction 
Consultant:  Bell & Spina
Contractor:  Concept Construction

LATEST NEWS: Update current through 08/12/2016 -- Construction for this summer season is complete and construction will resume again in the Spring of 2017. 

top


Project: 05338 - Rockefeller Arts Center Addition (SUCF Project) 
Project Phase:  Construction
Consultant:  Deborah Berke & Partners Architects
Contractor:  Northland Associates

Expected Start of Construction:  5/1/2014
Expected Completion of Construction:  8/1/2016

LATEST NEWS: Update current through 08/12/2016 --This project is in construction. 

top


Project: 051003-02 - Demolish Academic Spine Bridge (SUCF Project) 
Project Phase:  Construction
Consultant:  LaBella Associates
Contractor:  Union Concrete & Construction Corp.

Expected Start of Construction:  5/16/2016
Expected Completion of Construction:  8/12/2016

LATEST NEWS: Update current through 08/12/2016 -- This project is nearing completion. The contractors are currently completing punchlist items and final clean-up. 

top


Project: 05344 - Dods Hall Exterior Rehab 
Project Phase:  Construction
Design Cost: $126,814.27
Consultant:  Young + Wright Architectural 
Construction Cost:  $851,000
Contractor:  Concept Construction 

Expected Start of Construction:  May 2017
Expected Completion of Construction:  08/11/2017

LATEST NEWS: Update current through 08/12/2016 -- The construction portion of this project has been postponed until the summer 2017 season.

PROJECT DESCRIPTION:

Constructed in 1962, Dods Hall is part of an athletic complex, which supports competitive intercollegiate and recreational intramural athletic programs. Special features of the Dods Hall include: a gymnasium, dance studio, racquetball courts, two fitness centers, classrooms and athletic offices. The existing 1962 (original) single glazed and metal panel window system and exterior vestibule doors have developed leaks in various locations over the years. The leaking windows have damaged interior walls, flooring and ceilings. The campus has continually addressed the damage but the amount of damage and caulking has become unmanageable and the windows are no longer holding up to the constant repairs. In addition to the windows, there is damaged masonry brick located in various areas around the window sills and lintels. The proposed project is to remove the existing windows and entry doors and install new energy window systems, doors and frames. Due to the age of the windows and the damage surrounding them, repair to the masonry brick and lintels at various locations is required. ACM and PCB abatement is required. Work on the interior walls and sills is required due to damage as well as GWB removal to demo the window system.

top


Project: D059GK - Kirkland Complex Roof Replacement 
Project Phase:  Construction
Design Cost: $86,738.04
Consultant:  Young + Wright Architectural 
Construction Cost: $1,336,000  
Contractor:  Jamestown Roofing

Expected Start of Construction:  5/1/2016
Expected Completion of Construction:  8/12/2016

LATEST NEWS: Update current through 08/12/2016 --This project is in construction.

top


Project: 05J01 - Replace AHUs & Controls Ph II & Ph III
Project Phase:  Design
Design Cost: $196,150.07
Consultant:  Wendel
Construction Cost: To Be Determined
Contractor:  To Be Determined

Expected Start of Construction:  5/15/2017
Expected Completion of Construction:  9/30/2017

LATEST NEWS: Update current through 08/12/2016 -- This project is in design.

PROJECT DESCRIPTION:

The State University of New York at Fredonia conducted a site survey in an attempt to evaluate the condition of air handling units campus wide. It was found that almost all of the units on campus have reached the end of their useful life expectancy. Phase I Reed Library South is currently under construction. The campus is preparing for the next two Phases - Reed Library North (Phase II) and McEwen Hall (Phase III). The existing air handlers in both areas have exceeded their useful life with excessive deterioration and corrosion has caused excessive leaking and reduced performance.

top


Project: 05J00 - Fredonia Admissions Center
Project Phase:  On Hold
Design Cost: $499,000
Consultant:  Architectural Resources, P.C.
Construction Cost:  To Be Determined 
Contractor:  To Be Determined

Expected Start of Construction:  To Be Determined
Expected Completion of Construction:  To Be Determined

LATEST NEWS: Update current through 08/12/2016 -- The solicitation for this project has been cancelled and the project is postponed until further notice.

PROJECT DESCRIPTION:

The main features of the work shall include, but not be limited to the following: Construction of a new 12,800 square foot, single story Admissions Center building to house offices, meeting rooms, presentation rooms, a reception / lobby area, open work areas, and outdoor courtyard.

Facilities Planning Office

140 Hendrix Hall
State University of New York at Fredonia
Fredonia, NY 14063
(716) 673-3722